All Products
-
Polyurethane Round Belt
-
Polyurethane V Belt
-
Super Grip Belt
-
Polyurethane Rollers
-
Polyurethane Wheels
-
Screen Printing Squeegee
-
Polyurethane Rubber Sheet
-
Polyurethane Parts
-
Kevlar Belts
-
Extruded Polyurethane
-
Parallel Belt
-
Polyurethane Tubing
-
Polyurethane Timing Belt
-
PVC Conveyor Belt
-
Urethane Belt Welder
-
Mr. Alcioni possamaiCustomer satisfaction products , good service !
-
Mr.Mikewe are very impressed with the quality of the belts you produced.
-
Mr. joneyour products are very popular in my markets.
85A 100m Polyurethane Round Belt Cord Reinforced For Transmission
Name: | Polyurethane Round Belt |
---|---|
Color: | Red Green |
Hardness: | 85A-90A |
Hardness 90A Polyurethane Round Drive Belting 20mm High Tensile Strength
Material: | Polyurethane |
---|---|
Color: | Any Color |
Hardness: | 85A-90A |
2mm Orange Polyurethane Round Belting Cord Reinforced 85A
Material: | PU |
---|---|
Color: | Any Color |
Hardness: | 85A-90A |
90A 400m PU Polyurethane Round Belt Drive Belting 400m
Material: | PU |
---|---|
Color: | Any Color |
Hardness: | 85A-90A |
PU Surface Smooth Polyurethane Round Belt Import Raw Material 90A 1.25g/Cm3
Length: | 30 Meter /rolls |
---|---|
Color: | Orange |
Hardness: | 90A |
PU Polyurethane Round Belt Good Resistance Green 300m/Roll
Color: | Green |
---|---|
Material: | PU |
Longth: | 300m/roll 200m/roll 100m/roll |
Heat Resistant Polyurethane Rubber Round Belt Extruded Thermo
Color: | Green Or Orange |
---|---|
Hardness: | 85A-90A |
Export Port: | Shanghai |
Smooth Rough Industrial Transmission Urethane Round Belt Polyurethane Cord Connected
Length: | 400m/roll 200m/roll |
---|---|
Hardness: | 90 A |
Color: | Orange And Green |
Green Color Polyurethane Round Belt Hardness 85A Transmission Belting 400m/Roll
Material: | PU |
---|---|
Color: | Green Color |
Hardness: | 85A |
Hardness 50 Shore A~95 Of Polyester Pad And Polyurethane Liner Plate
Packaging Details: | Inner packing is plastic film .outer packing is carton . |
---|---|
Delivery Time: | Within 10 working days After deposit |
Payment Terms: | T/T, 50% payment in advance ,50% balance before shipment |